Commission Electrotechnique Internationale
International Electrotechnical Commission
Международная Электротехническая Комиссия

 

Queries, comments, suggestions? Please contact us.



Area Overhead lines / Foundations

IEV number466-09-10

EN
backfill
the soil removed during excavation and re-instated after the installation of the foundation
Source: see fig. 4.3

FR
remblai
partie des terres retirées lors du creusement de la fouille, remise en place après confection de la fondation

Source: voir fig. 4.3

AR
ردم

DE
Wiederverfüllmaterial

ES
relleno

IT
reinterro

PL
zasyp rodzimy (wykopu)

PT
enchimento

SV
återfyllning

Publication date: 1990-10
Copyright © IEC 2010. All Rights Reserved.