anticipated operational occurrence
AOO
all operational processes deviating from normal operation which are expected to occur once or several times during the operating life of the plant and which, in view of appropriate design provisions, do not cause any significant damage to items important to nuclear safety nor lead to accident conditions

Note 1 to entry: This entry was numbered 393-18-18 in IEC 60050-393:2003.


[SOURCE: IAEA 3, modified]


fr
incident de fonctionnement prévu, m
IFP, m
ensemble des écarts de fonctionnement par rapport à l’exploitation normale que l’on s’attend à voir se produire une ou plusieurs fois pendant la durée de l’exploitation de la centrale nucléaire et qui, compte tenu des dispositions prises lors de la conception, ne provoquent pas de dommages significatifs aux éléments importants pour la sûreté nucléaire et ne dégénèrent pas en situation accidentelle

Note 1 à l'article: Cet article était numéroté 393-18-18 dans la CEI 60050-393:2003.


[SOURCE: AIEA 3, modifiée]


de
vorhergesehene Betriebsvorgänge des anomalen Betriebs, m pl

es
incidente de operación anticipado, m

it
incidente di funzionamento previsto
AOO

ko
예상 운전 사상

ja
予測運転事象

pl
zdarzenie eksploatacyjne przewidywane, n
AOO,

pt
incidente de funcionamento previsto

zh
预计运行事件
AOO

Publication date: 2014-03
Copyright © IEC 2024. All Rights Reserved.