sequential forced tripping of generation and/or transmission units caused by excessive loading of lines carrying power into or out of an area
NOTE 1 – Forced tripping to protect equipment may be either automatic or manual actions.
NOTE 2 – Cascading is uncontrolled if it leads to instability or voltage collapse.
|